深夜爽爽动态图无遮无挡,亚洲Av永久无码精品国产精品,日本熟妇人妻XXX╳Ⅹ,免费播放一区二区三区

Service hotline:

0315-5913666

+86-18931500255

Domestic > Shendong Coal South Baode Coal Preparation Plant Coking Coal Production Process Renovation Project
神東煤炭保德南部區(qū)選煤廠配焦煤生產(chǎn)工藝改造項目(附圖).jpg
  • 神東煤炭保德南部區(qū)選煤廠配焦煤生產(chǎn)工藝改造項目(附圖).jpg

Shendong Coal South Baode Coal Preparation Plant Coking Coal Production Process Renovation Project

Type: Coking coal preparation plant

Scale: 8.0Mt/a

Contracting mode: EPC general contracting, renovation projects

Process: 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. Coal with a size greater than 0.25mm is sorted by a heavy medium cyclone 0.25mm coarse clean coal slurry is recovered using a curved screen and coal slurry centrifuge.<0.25mm clean coal slurry is concentrated by a thickener and then combined with a horizontal settling filtration centrifugal dewatering machine and a filter press for dehydration and recovery; After the tail coal slurry is concentrated in the thickener, it is dehydrated and recovered by a filter press, and the washing water is circulated in a closed loop, which is environmentally friendly and energy-saving.